Power Asset testing

Our expert team conducts thorough testing and commissioning of electrical systems to guarantee they operate flawlessly.


This service ensures your systems are reliable, safe, and ready for peak performance.


Book now!

Scope of Testing

  • Power Transformer Testing

    - Overall Insulation Power Factor Test

    - Capacitance Testing (Winding)

    - Exciting Current Test

    - Transformer Turn Ratio Test

    - Leakage Reactance / Short Circuit Impedance Test

    - Winding Resistance Test

    - Insulation Resistance Test / Polarization Index

    - Bushing Test

          Insulation Resistance Test

          Capacitance Test (C1 & C2)

          Insulation Power Factor

          Bushing Hot Collar Test

    - Partial Discharge Surveillance

    - Sweep Frequency Response Analysis (SFRA)

    - Insulating Oil Power Factor Test

    - Insulating Oil Dielectric Breakdown Voltage

    - Load Tap Charger Test

  • Generator Testing

    - Insulation Resistance

    - Winding Resistance

    - Power Factor

    - Partial Discharge (Online)

    - Electro Magnetic Interference (Online)

  • Power Circuit Breaker Testing

    - Contact Resistance Test

    - Timing Test

    - Insulation Power Factor Test (Watts Loss)

    - Insulation Resistance

    - Molded Circuit Breaker Analysis

    - Current Injection

    - Vacuum Bottle Analysis

  • Potential Transformer Testing

    - Insulation Power Factor Test

    - Turns Ratio Testing

    - Winding Resistance Test

    - Insulation Resistance Test

    - Excitation Test

  • Current Transformer Testing

    - Insulation Power Factor Test

    - Turns Ratio Testing

    - Winding Resistance Test

    - Insulation Resistance Test

    - Excitation Test / Saturation Test

    - Current Transformer Analysis

  • Surge Arrester Testing

    - On-line Leakage Current Test for MOSA     (Metal Oxide Surge Arresters)

    - Insulation Power Factor Test (Watts Loss)

    - Insulation Resistance Test

  • Protective Relay

    - Electromechanical Relays

    - Electronic Relays

     - Single Phase

     - Three Phase

    - Numerical Multi-function Relays (Basic Relays)

    - Simulation / Integrity Check of Fault Clearance System

     - Secondary Current Injection

  • Meters & Transducers

    - Energy Meters

    - Electromechanical Meters

          Single Phase

          Three Phase

    - Electronic Meter

    - Indicating Meters

          Single Function

          Multi-function

     - Transducer


  • Rotor Testing

    - Insulation Resistance

  • Capacitive Voltage Transformer

    - Insulation Power Factor

    - Capacitive Test (C1 & C2)

    - Insulation Resistance Test

    - Hot Collar Test

    - Cut Ratio Test

  • Disconnect Switch Testing

    - Contact Resistance Test

    - Insulation Resistance Test

  • Post Insulators Testing

    - Insulation Power Test

    - Insulation Resistance Test

  • Transformer Oil Testing

    - Dissolved Gas Analysis

    - Furan Analysis

    - Moisture Content

    - Neutralization Acid Number

    - Interfacial Tension

    - Dielectric Breakdown Voltage

    - Power Factor/Dissipation Factor

    - Dielectric Constant

    - Conductivity

    - Color

    - Visual Inspection

    - Specific Resistance

    - Corrosive Sulfur Test

Brief List of Projects and Clients

  • Clients

    • National Grid Corporation of the Philippines

  • Industries Served

      Power GenerationManufacturingHospitalsUtilityManufacturingFacilities ManagementElectricalFoodReal EstateEntertainmentGovernment & LGU